attachement contradictoires

English translation: joing progress sheets

GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW)
French term or phrase:attachement contradictoires
English translation:joing progress sheets
Entered by: Marco Solinas

14:38 May 14, 2010
French to English translations [PRO]
Bus/Financial - Law: Contract(s) / Contract clauses
French term or phrase: attachement contradictoires
From the administrative clauses of a construction contract : The contractor's representative must have the authority to:
"Signer les attachements contradictoires".
An item in a list of prerogatives of the contractor's representative. Thanks to all.
Marco Solinas
Local time: 18:53
progress sheets
Explanation:
These are signed by the representatives of the contractor and client at the regular site meetings and are the basis of valuations for interim payments.

"Daily recording of the actions done by all parties on a construction site is ... data that need to be recorded daily on a construction site are shown in Fig. .... The relationship between the “Progress” sheet and the “Schedule” sheet is ..."
link.aip.org/link/?JCEMD4/131/513/1



--------------------------------------------------
Note added at 3 hrs (2010-05-14 17:56:39 GMT)
--------------------------------------------------

"On 5 January 2004 a site meeting was held so that the Planning Inspector could .... 22 October 2004 on the site progress sheet. He noted the agent had only ..."
cms.wiltshire.gov.uk/CeConvert2PDF.aspx?MID=2837&F...

"Preparing Daily Progress Sheet. • Co-ordinate and Inspecting the ... Attends and organize all site meeting within the engineer/consultants for MEP. ..."
ndtcareers.com/index.php?action=viewresume&rid=2554

Also sometimes known as "progress reports"


--------------------------------------------------
Note added at 2 days44 mins (2010-05-16 15:22:15 GMT)
--------------------------------------------------

See reply to juliebarba: could be "jointly agreed progress sheets".
Selected response from:

B D Finch
France
Local time: 03:53
Grading comment
Thank you B D. Most useful
4 KudoZ points were awarded for this answer



Summary of answers provided
4progress sheets
B D Finch
3 -1counter statement
Claire Nolan


Discussion entries: 1





  

Answers


32 mins   confidence: Answerer confidence 3/5Answerer confidence 3/5 peer agreement (net): -1
counter statement


Explanation:
Once the work is done by the co-contractor, a document called a "counter statement"
["attachement contradictoire"] is drawn up every month and approved by the contracting parties,
i.e., the Urban Affairs Department, as the implementing agency, the AADL as the
operator/developer or the project manager, the Consulting Firm as the main contractor, and the


http://www-wds.worldbank.org/external/default/WDSContentServ...

Claire Nolan
Local time: 21:53
Native speaker of: English
PRO pts in category: 52

Peer comments on this answer (and responses from the answerer)
disagree  Julie Barber: I think that the translation on the link is incorrect. "contradictoires" means two-way, involving both parties. It probably means something like "to be signed by both parties" or "drawn up by both parties"in this case
5 mins
  -> I think you might be right, Juliebarba; googling 'counter statemtent' gets me nowhere near this context. I was probably misled.
Login to enter a peer comment (or grade)

3 hrs   confidence: Answerer confidence 4/5Answerer confidence 4/5
progress sheets


Explanation:
These are signed by the representatives of the contractor and client at the regular site meetings and are the basis of valuations for interim payments.

"Daily recording of the actions done by all parties on a construction site is ... data that need to be recorded daily on a construction site are shown in Fig. .... The relationship between the “Progress” sheet and the “Schedule” sheet is ..."
link.aip.org/link/?JCEMD4/131/513/1



--------------------------------------------------
Note added at 3 hrs (2010-05-14 17:56:39 GMT)
--------------------------------------------------

"On 5 January 2004 a site meeting was held so that the Planning Inspector could .... 22 October 2004 on the site progress sheet. He noted the agent had only ..."
cms.wiltshire.gov.uk/CeConvert2PDF.aspx?MID=2837&F...

"Preparing Daily Progress Sheet. • Co-ordinate and Inspecting the ... Attends and organize all site meeting within the engineer/consultants for MEP. ..."
ndtcareers.com/index.php?action=viewresume&rid=2554

Also sometimes known as "progress reports"


--------------------------------------------------
Note added at 2 days44 mins (2010-05-16 15:22:15 GMT)
--------------------------------------------------

See reply to juliebarba: could be "jointly agreed progress sheets".

B D Finch
France
Local time: 03:53
Specializes in field
Native speaker of: English
PRO pts in category: 369
Grading comment
Thank you B D. Most useful

Peer comments on this answer (and responses from the answerer)
neutral  Julie Barber: Hi BD, wouldn't you need to add "joint" or something in? to show that it relates to both parties?
3 hrs
  -> One could add "jointly agreed", but it is standard practice that they have to be signed off by the client representative.
Login to enter a peer comment (or grade)



Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.

KudoZ™ translation help

The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.


See also:
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search